R111.5 is working good for me now and i dont want to
get into the mix/match of R12.3. So was wondering if there
is a "target" date (or scheduled date) for getting the
remaining programs up to speed with R12.3?
thanks,
savagcl
(clif)
get into the mix/match of R12.3. So was wondering if there
is a "target" date (or scheduled date) for getting the
remaining programs up to speed with R12.3?
thanks,
savagcl
(clif)
Comment